VILLENEUVE-ST-GEORGES MAINTENANCE CENTER
Period : 2018-2020
Budget of the Operation : 140 M€
_ Construction of 7 new technically complex buildings (30 500m²) in interface with the railway network involving a team of 25 experts in various fields
_ Deep environmental reflections with innovating features : structure of the massive workshop (7 trains sheltered at the same time) made out of wood, installation of a photovoltaic power plant, target of certifications Low Carbon Building, Effinergie.
_ Production and delivery of all the different conception steps in line with the planning and with the costs of the client
RENOVATION OF ST-LAZARE STATION HALLS, PARIS
Period : 2016-2019
Budget of the Operation : 100 M€
_ Renovation of a iconic historical location (first train station built in Europe) in a complex environment (25 000m² and second highest number of passengers in Europe), with presentations and follow-up with the French Historical Architects.
_ Coordination of a multidisciplinary team in the preliminary outline phase, final design and tender  documents : up to 3 architects and 21 engineers
_ Production and delivery of these different steps in line with the planning and with the costs of the client

VARIOUS PROJECTS IN ST-LAZARE STATION, PARIS
Period : 2015-2019
Total Budget of the Operations : 50 M€
_ Assisting in the management of a team of 15 architects at the highest, including allocation of resources, task planning or contract negociations with the clients.
_ Conception of new commercial and public areas in the upper floors of a complex and busy train station (sport and relaxation center, restaurants, bar, office rooms to rent, new accesses...)
_ Production of building permits,  construction site supervision and approval of construction companies' documents.
RENOVATION OF GRENOBLE TRAIN STATION
Photographe : Pierre-Antoine PLUQUET
Photographe : Pierre-Antoine PLUQUET
Photographe : Christian PEDROTTI
Photographe : Christian PEDROTTI
Photographe : Christian PEDROTTI
Photographe : Christian PEDROTTI
Photographe : Mathieu LEE VIGNEAU
Photographe : Mathieu LEE VIGNEAU
Photographe : Mathieu LEE VIGNEAU
Photographe : Mathieu LEE VIGNEAU
Photographe : Christian PEDROTTI
Photographe : Christian PEDROTTI
Period : 2015-2016
Budget of the Operation : 35 M€
_ Production of the Building Permit and multiple consultation files (DCE)
_ Approval of construction companies' drawing
_ Bi-monthly reviews of the construction site
RENOVATION OF LA SAMARITAINE, PARIS
Period : 2013
Budget of the Operation : 750 M€
_ Participation to the development of detailed models of the facade
_ Creation of 3D visuals and presentation for historical architects meetings
_ Modification of Conception Plans